CONTROL CABINET-Toncin Group
CONTROL CABINET
  • {dede:field.title/}
  • {dede:field.title/}
  • {dede:field.title/}
  • {dede:field.title/}
  • {dede:field.title/}
  • {dede:field.title/}
  • CONTROL CABINET

    It is mainly used in the central control room, underground parking lot and general ventilation lane of low methane gas mines, and is mainly used as DC power supply for the incoming, outgoing, liaison, lighting and wire-laying mineral electric locomotives in the substation low voltage side of the power supply system in main ventilation lane distribution ketone room.


    Scan QR code to view

    It is mainly used in the central control room, underground parking lot and general ventilation lane of low methane gas mines, and is mainly used as DC power supply for the incoming, outgoing, liaison, lighting and wire-laying mineral electric locomotives in the substation low voltage side of the power supply system in main ventilation lane distribution ketone room. This switch cabinet can be used with KYGC mining general high voltage switch cabinet. The high-and-low-voltage inverter soft start, high and low voltage switchgear, industrial ultrasonic cleaner, PLC control cabinet, box substation and other products can be used in such control system integration projects as mine automation (including six major control systems), sewage treatment automation, rubber dam automation and robot system integration etc, among which many technologies have obtained national invention patents and utility model patents.


    PRODUCT ADVANTAGES

    The power distribution cabinet is composed of 22 different line schemes and can be flexibly combined.

    The main components are products of domestic new technology or products produced by introduced technology, which have strong breaking ability, safety and reliability and are suitable for mine power supply system with rated voltage 660V and 380V.

    For user’s needs, some components can be selected as arc-free and maintenance-free devices.



    SERVICE SUPPORT

    Whole Technological Design

    Toncin determines reasonable plans and selections by conducting more systematic laboratory tests, semi-industrialization tests and theoretical analysis calculations and adopting appropriate methods in light of the actual problems faced by customers. And it determines specific parameters through laboratory tests and semi-industrial tests.

    Project Construction

    Toncin can provide customers with integrated project services for its perfect project management system and experienced high-quality team and can also provide customers with its best services in achieving the ultimate project goal by carrying out the management work on the project quality, schedule, safety, cost, procurement, information files, organization and coordination etc. according to customer’s contractual documents. Toncin contracts the design, procurement, construction and trials etc. for the entire process or some certain stages of the construction project according to the contract and takes full liability for the quality, safety, duration and cost etc. of the contracted project.

    Response Time and After-sales Services

    If any failure due to a defect has occurred during the warranty period, our company has given the following response and promise: to respond within 12 hours and rush to the domestic scene within 72 hours. With a rigorous and efficient service architecture, diverse and flexible service and response means, Toncin is capable of providing response service up to 7* 24 hours to ensure that users can get help at any time during the warranty period.

     


    SPECIFICATION PARAMETERS

    Serial No.

    Cabinet Model

    Outline Size (W.H.D)

    Remark

    1

    A1

    750x1400x400

     

    2

    A2

    700x1200x350

     

    3

    A3

    500X750X320

     

    4

    B0

    900X1800X500

     

    5

    B1

    750X1700X500

     

    6

    B2

    700X1600X400

     

    7

    B3

    650X1300X370

     

    8

    B4

    650X1400X370

     

    9

    C1

    450X550X300

    Including 50mm lug

    10

    C2

    550X650X300

    11

    C3

    650X750X300

    12

    D1

    750X850X400

    Including 50mm lug

    13

    D2

    800X1000X450

    14

    E1

    650X750X250

     

    15

    F1

    550X700X250

     

    16

    G1

    1250X850X450

    Including 50mm lug

    17

    G2

    1400X1000X500


    我要询价 ×
    我要订购 ×
    Online Message