Nuclear Industry Yantai Toncin Group Co.,Ltd.

  • Single Multifilament Filter Cloth
  • Double-layer Monofilament Filter Cloth
  • Flocculant
  • Agricultural and Forestry Water-retaining Agent
  • Quartz Ceramic Crucible
  • FGD Vacuum Belt Dehydrator
  • ZPL Series Filter Cloth Type of Disc Dewatering Machine
  • SGN Deep Cone Paste Thickener
  • GNZ Centre Drive Efficient Thickener
  • DY Serial Filter Press
  • Ecological Airbag Bracing Dam
  • Rubber Dam
  • Unmanned Aerial Vehicle
  • Health and Safety
  • Management standard
  • Toncin promises
  • About Us
  • Speech
  • News
  • HOME / Atmosphere & Water Environment / Water environment / Ecological Airbag Bracing Dam
    Ecological Airbag Bracing Dam
    The ecological airbag support dam, also known as the gas shield or gas shield dam is a new type of hydraulic structure that it is created by combining the strong points of rubber dam and steel gate dam. It can say a breakthrough of the rubber dam; it is also a technical revolution of the hydraulic gate and the cement flap gate. After 5 years of research and development, Yantai Sunny Rubber Co., Ltd. has achieved a number of significant achievements in airbag production technology, for instance: an authorized patent, two declared invention patents and 6 items of utility models
    Service Support

    Whole Technological Design

    Toncin determines reasonable plans and selections by conducting more systematic laboratory tests, semi-industrialization tests and theoretical analysis calculations and adopting appropriate methods in light of the actual problems faced by customers. And it determines specific parameters through laboratory tests and semi-industrial tests.


    Project Construction

    Toncin can provide customers with integrated project services for its perfect project management system and experienced high-quality team and can also provide customers with its best services in achieving the ultimate project goal by carrying out the management work on the project quality, schedule, safety, cost, procurement, information files, organization and coordination etc. according to customer’s contractual documents. Toncin contracts the design, procurement, construction and trials etc. for the entire process or some certain stages of the construction project according to the contract and takes full liability for the quality, safety, duration and cost etc. of the contracted project.


    Response Time and After-sales Services

    If any failure due to a defect has occurred during the warranty period, our company has given the following response and promise: to respond within 12 hours and rush to the domestic scene within 72 hours. With a rigorous and efficient service architecture, diverse and flexible service and response means, Toncin is capable of providing response service up to 7* 24 hours to ensure that users can get help at any time during the warranty period.

    Specification Parameters


    Designed dam height


    Internal pressure ratio

    KN/mDam bag radial calculation strength

    Model of dam bag

    (L.)mEffective sectional perimeter of dam bag

    (D)mFloor length of dam bag

    mmDam bag thickness

    Safety factor

    1

    5

    SND1.0-080-3

    3.48

    0.6

    8

    36

    1.5

    1

    11.25

    SND1.5-100-3

    5.22

    0.9

    8

    20

    2

    1

    20

    SND2.0-120-3

    6.96

    1.2

    10

    13.5

    2.5

    1

    31.25

    SND2.5-160-3

    8.7

    1.5

    10

    11.52

    3

    0.9

    40.5

    SND3.0-200-3

    10.58

    1.92

    12

    11.11

    3.5

    0.8

    49

    SND3.5-220-3

    12.57

    2.42

    12

    10.1

    4

    0.8

    64

    SND4.0-360-3

    14.36

    2.76

    14

    12.66

    Product Advantages

    - Simple structure, easy installation. The unitized and modularized structure does not require the use of large-scale construction equipment, which saves manpower, material and financial resources, shortening the construction period .

    - Fully safe

    - Good ecology landscape

    - Low management and operation cost

    - High capacity for cleaning and discharging sediment

    - Strong earthquake resistance

    - Wide application range


    Picture show
    01.jpg
    01.jpg
    02.jpg
    02.jpg
    03.jpg
    03.jpg
    04.jpg
    04.jpg
    05.jpg
    05.jpg
    06.jpg
    06.jpg
    07.jpg
    07.jpg
    08.jpg
    08.jpg
    09.jpg
    09.jpg
    10.jpg
    10.jpg
    11.jpg
    11.jpg
    12.jpg
    12.jpg